APA Member and Certified Plant
Center Point High School - Center Point, AL
Center Point High School - Center Point, AL

Center Point High School - Center Point, AL
Precast Scope: 496 pieces of Architectural Precast
Project Scope: $38 Million
Building Size: 264,000 SQFT
Architect: Evan Terry Associates
General Contractor: Gary C Wyatt
Mason: XCel Masonry Inc

The front of Center Point High School is in an L shape that is comprised of brick, curtain walls and precast. The project used over 5300 cubic feet of precast concrete and from the pictures, the front stretches across the south and the west elevations. The school and gymnasium entries are large precast radius canopies with large columns. Each column is unique since its shape follows the contour of the overall canopy radius. Each canopy has 22 letters casted in the precast using 1’ and 2’ high letters.

JN3070